The City of Duvall owns one vacant, buildable lot in the densest new zone its draft rules would create: Lot 409, two acres on Big Rock Road. What happens to it is one of the choices the rezoning puts in front of the town. This page sets out what the record says about the lot, four things the City could do with it and what each would cost, and the questions about whether a new police station is needed. Numbers in brackets are the article's sources.
The rezoning puts its densest new zone, MU30 (at least 30 homes an acre, with shops allowed), at the south end of town along Big Rock Road [12][44]. That same stretch of road is where almost every other decision about Duvall's land is now being made.
The lot
In 2008, when the Walden neighborhood (now The Ridge at Big Rock) was planned, the city's agreement with the developer required it to hand over "two acres of property ... to establish a city facility, unless otherwise agreed by the City": "two unencumbered buildable acres," delivered as "a finished grade pad ... including installed utilities and improved street frontage" [41]. The agreement's traffic study was to assume a 35,000 square foot city services building there [41]. The land arrived in December 2022: Lot 409, 2.09 acres at the corner of Big Rock Road and the Walden entrance, deeded to the city at no cost "as required for the approval of the plat" (the plat is the recorded map of the subdivision) [42]. Nothing has been built on it. The county appraises it at about $3 million [43]. It has road on two sides and the neighborhood park beside it.
Sewer is not the limit. The town's treatment plant was expanded after the 2021 pause on new sewer connections, and now runs well under its capacity [47].
What the city has in mind
On August 19th, 2025 the city's building consultants told the council that the police station, city hall and maintenance yard "are at the end of life" and "way too small" [45]. Of the police station, a city building at Depot Park [46], they said it has "one point of egress that could easily be blocked," exposed computer equipment, and evidence and locker rooms "too cramped to function into the future." They recommended a new station built for the purpose "on a site outside the downtown core" [45]. They gave two options: a police station on "the Big Rock two-acre parcel," which they described as city-owned, vacant and at the south end of town, with city hall on the public works yard downtown; or city hall and police together on that parcel. They also listed it among city properties the city "could divest from to finance construction." The consultants' study followed in February 2026. It recommends a city campus with City Hall and the Police Station on the 271st Avenue and Big Rock Road property [60], which is this lot. The budget document before the council says "The Council preferred a combined campus style setting" at "the 2 acre parcel the city owns off of Big Rock Road" [66]. That is a preference, and we have seen no final decision. (corrected)
Four things the City could do with the lot, and what each would cost
Two are the City's: a civic campus, and selling the lot. Two are ours: homes on a lease, from the fourth ask in our September letter, and jobs and workspace, from the sketch in that letter. Here they are side by side.
(a) A civic campus with City Hall and the police station
This is what the City's consultants recommended and what a budget document says the Council preferred [60][66]. The draft MU30 zone reads: "Residential density is a requirement for any new development," at least 30 homes an acre [44]. Its table of allowed uses allows a "police facility" there only "as part of a mixed-use development that conforms to minimum residential density requirements" [44]. So under the draft as written, a police station on Lot 409 is allowed only as part of a building that also has about 60 homes on the 2.09 acres. The final rules, an exemption for city buildings, or a rezone could change that. Parking is the other question. By our own rough estimate (October 2026, surface parking only), about 60 full-price homes and their parking do not fit on the lot's ground at three or four storeys under the draft's parking rules, unless the parking goes into a garage or the City's planning director grants a discretionary 50% reduction. A station's own parking would be part of that count or beyond it, depending on its size. Whether the City counts this lot as room for homes in answering the state is unclear, and the City's own records disagree: its December 2025 capacity memo says "publicly owned lands were already removed from the buildable land supply" [15], while its maps shade the lot vacant and re-developable. If the lot is counted, a station alone would use up room the City is counting on, in a test our estimate puts between 10 homes short and 44 over (the numbers).
(b) Homes on a long City lease
The draft rules already require homes in MU30 [44]. The City could keep the land and lease it for decades to a builder or nonprofit, on a lease that requires the rents to stay low. Under the draft's parking rules, homes held at lower rents need fewer parking spaces, and by the same rough estimate about 60 of them fit on the ground at three storeys. At Lot 409's own appraisal, the land is worth about $48,700 for each apartment. That is what the public would be giving up, and also what it would buy: together with waived fees and a property-tax break (about $97,000; the City drafted such a break in September, and it is not in the November drafts), it covers what it costs to hold a rent at the level a $44,400 household can afford for twelve years [16][43]. The costs are real. Land leased below its value is a public subsidy to whoever builds. A long lease leaves a private building on public land for decades, outside the City's control until the lease ends. And land used for homes cannot be used for a campus or for workspace. The open questions: who would build it, who would hold and enforce the rent limit, and what happens to the building when the lease ends?
(c) Jobs and workspace
The lot is high, sunny, on the road out of town, and was meant to come with utilities. The town's worries, as residents stated them at the September meetings, are homes people can afford, work close to home, roads and pipes before more people, and being cut off when the river rises [13]. The City's own plan describes a use that speaks to some of them. Policy LU 7.1: "Encourage commercial, small-scale manufacturing, makers' space, flexible spaces, and institutional uses to support family-wage jobs ... foster entrepreneurship and new business development, and create opportunities for workforce training." Policy LU 7.5: affordable live and work studios, with nonprofit partners [46]. Our September letter sketched one building for the lot: shared workshops and a kitchen, with permanently affordable homes above, on land the city leases out. We are reworking that idea and have not settled what should replace it. The cost: under the draft rules any new building here must also include homes [44], a lease carries the same three drawbacks as (b), and someone must pay to build and run the workspace; the plan names no one, and neither do we yet. The open questions: who would run it, who would pay for it, and who would rent the space?
(d) Selling it
The consultants listed the lot among city properties the city "could divest from to finance construction" [45]. The City would get about its appraised $3 million toward buildings elsewhere [43]. If the city sells it, the 2008 agreement gives the developer (now Toll Brothers) "a right of first refusal to re-acquire" it, meaning the first chance to buy it back [41]. If the city builds on it for its own use, the developer reviews and comments on the plans, and the city keeps the final say [41]. A long-term lease is neither: the city keeps the land, and the building on it belongs to someone else for the life of the lease. The cost of selling: once sold, the public's two acres in the new densest zone are gone.
A question that bears on the first choice: does the City need a new station?
The City has not answered these questions in public.
- Is the old station really used up? The City renovated it in 2023 and 2024 with federal recovery money: a new women's locker room, flooring, windows and paint, a project of $100,000 to $200,000 [50]. A year later its consultants called the locker rooms too cramped [45]. The other problems they named (one way in and out, exposed computer equipment, tight evidence storage) could call for a remodel or for a new building; the City has not shown which. The department has 13 sworn officers [46].
- Could it grow where it is? The station sits on a city-owned parcel at Depot Park of 6.68 acres, zoned for public buildings, with public water, sewer and road access, shared with the historic train depot [54]. That is more than three times the size of the 2.09-acre Big Rock lot. The upper part, on the Main Street side, is outside the flood zone on the federal flood map; the low side toward the river is in the 100-year floodplain [55]. The city owns the land between the station and Main Street farther south: a 3.68-acre parcel next to the station and a 0.88-acre lot beside it that reaches Main Street [54]. Parts of both are in the floodplain. The business lots next to the station, including the church, have their own easements (rights to use part of someone else's land) and a protected wetland behind the church [56].
- Was fixing it ever studied? The February 2026 study calls the station "a modular structure not built to the appropriate code standard for an essential facility," and says the site has "no space to expand due to surrounding wetlands and adjacency to Depot Park," with the location in the 500-year floodplain [60]. We have not seen a remodel priced against that. Has the City priced a second way out over its own land, or an added secure building on the upper lot, against a new station?
- What would a new one cost? The consultants warned that a new police station and city hall would cost more than the council can borrow without asking the voters [45]. The February 2026 study puts that borrowing limit at $38 million as of 2023, and cites $45.3 million (in 2029 dollars) for City Hall, the Police Station and a parking garage together, reduced to $35 million on the 271st Avenue property, where the garage would not be needed. It is not a figure for a station alone [60] (corrected). For scale, the city's new maintenance center alone is estimated at $21.9 million [50].
- What else matters? The consultants said the department would prefer a site "outside the downtown core" [45], and fixing the building does not answer that preference. The river side of the Depot Park parcel likely falls under shoreline rules, the depot is historic, and a station beside a public trail needs careful security design.
Before it commits to a new station anywhere, the City could publish the police department's space study, the cost of fixing the station it has against the cost of building one, and its plan for the Depot Park building if the police leave it. An independent check of the department's space needs, by someone other than the consultants proposing the new building, would help the town judge.
Follow the money
The city is planning real buildings. Its new maintenance and operations center, on a Big Rock parcel, is estimated at $21.9 million, and the city says it can already cover the full design and a large part of construction [50]. Staff make a strong case for it: the public works crew shares a 1,200 square foot shed [50]. A city hall and police station are next on the list, at the cost above [60]. (corrected)
What we ask
Lot 409 is the only vacant, buildable city lot in the proposed MU30 zone. Each choice above has a price: money, parking, control of the land, or the uses it rules out. We ask the City to weigh them side by side, with their costs, in public, before it commits the lot.
- 12. Source 12 in the details.
- 13. Source 13 in the details.
- 15. Source 15 in the details.
- 16. Source 16 in the details.
- 41. Source 41 in the details.
- 42. Source 42 in the details.
- 43. Source 43 in the details.
- 44. Source 44 in the details.
- 45. Source 45 in the details.
- 46. Source 46 in the details.
- 47. Source 47 in the details.
- 50. Source 50 in the details.
- 54. Source 54 in the details.
- 55. Source 55 in the details.
- 56. Source 56 in the details.
- 60. Source 60 in the details.
- 66. Source 66 in the details.
Working analysis by one valley household and its collaborators. Not legal, planning or financial advice, and not the position of the City of Duvall, King County, or any agency.
Write to us here, or at steward@dontbothellduvall.com. A person reads every message. We answer the way you tell us to, and we never publish your name.